Home / Hoardings & structures

Construction hoardings and billboard structures across Saudi Arabia.

At Diriyah Gate we built hoarding walls 250 m by 14 m and 500 m by 12.5 m. At King Khalid International Airport we built the 3,000 m² LG structure that set a Guinness World Record. Steel, foundations, cladding and artwork, by one team.

Flagship projects

Two projects we're known for.

Guinness World Record, 2014

Guinness World Record, 2014

The world's largest outdoor advertising structure: 3,000 m² for LG, with JCDecaux ATA, at King Khalid International Airport, Riyadh. Certified on 16 September 2014.

Diriyah Gate development

Diriyah Gate development

Hoarding walls 250 m by 14 m and 500 m by 12.5 m, a 4,000 m² structure for the Diriyah Gate Development Authority, and mud-render works with the authority's seal lit into the walls.

A hoarding is the first thing the public sees of your project, often for years.

It stands through Shamal winds and summer heat on a site that keeps changing around it. On a 500-metre run, every panel that sits out of line shows.

And it usually has to be up before the real work starts, so the hoarding sets the pace for the whole programme.

We engineer the frame and foundations for the length and height you need, then clad, print and light it.

What we build

Four kinds of structure, one team from footing to artwork.

Construction site hoardings

Perimeter hoardings for building sites and infrastructure projects, on engineered steel frames.

Branded project hoardings

Hoardings that carry the developer's artwork, logos and lighting, like the lit seal at Diriyah Gate.

Billboard & unipole structures

Roadside and airport-road structures for media owners, as we built for JCDecaux in Riyadh and Dammam.

Foundations & steel

Concrete footings, steel frames and installation at height, engineered and built in-house.

From footing to finished wall

Concrete foundations for a hoarding structure
Concrete foundations for a hoarding structure
Steel frames for a long roadside hoarding
Steel frames for a long roadside hoarding
Frames and panels during construction
Frames and panels during construction
Completed roadside hoarding
Completed roadside hoarding
GE roadside hoarding
GE roadside hoarding
Lit seal of the Diriyah Gate Development Authority
Lit seal of the Diriyah Gate Development Authority

How we take a hoarding package

Five steps, one point of contact.

  1. 01

    Send the drawings

    Site plan, hoarding length and height, artwork brief and your target date.

  2. 02

    Engineering & quotation

    Frame and foundation design for the site, with a priced quotation.

  3. 03

    Foundations

    Footings set out and poured along the hoarding line.

  4. 04

    Steel & cladding

    Frames erected, panels fixed and aligned along the full run.

  5. 05

    Artwork & handover

    Printed artwork, logos and lighting fitted, then handed over.

Questions contractors and media owners ask

How long and how high can a hoarding be?

At Diriyah Gate we built hoarding walls 250 m long by 14 m high and 500 m long by 12.5 m high, plus a 4,000 m² structure for the Diriyah Gate Development Authority.

Do you build billboard structures for media owners?

Yes. We built airport-road hoardings in Riyadh and Dammam for JCDecaux in 90 days, and the 3,000 m² LG structure at King Khalid International Airport with JCDecaux ATA, certified as a Guinness World Record on 16 September 2014.

Can you print and light the artwork?

Yes. We fit printed artwork, logos and lighting. At Diriyah Gate the authority's seal is lit into the walls.

Have you built hoardings for Saudi Aramco?

Yes. We built the Ajyal project hoarding for Saudi Aramco in 2014.

Which cities do you cover?

All regions of Saudi Arabia from our offices in Al Khobar and Riyadh, plus Bahrain and the UAE.

Send us the site plan.

Email the RFQ, drawings and target date to Info@taga.com.sa, or send them on WhatsApp to +966 50 480 7748.